MEP design for new middle school. Includes Computer Tech Labs, Science Labs as well as Standard Classrooms, 2 story Cafeteria, Kitchen, Practice and Competition Gymnasiums, Band, Choir, Orchestra, Large and Small Flex areas, Locker and Shower facilities for Athletics, and Complete State of the Art Welding Shop Building. 100% LED lighting inside and out, Advanced Power Monitoring – ability to view Energy Usage by Total, HVAC, Lighting and Low Voltage, Also, ability to track after hours Energy usage, Advanced Multi-Level Surge Protection to ensure long life of all connected equipment, Mechanical System Design for Maximum Efficiency and proper building pressurization for all uses including Summer and After Hours Events, and 24/7 Technology AC, Low Flow Toilets, Urinals and Faucets for water conservation. Ultra Efficient Water Heaters designed to avoid Boilers.
K-12
Corsicana, TX
2017
165,305
$33,000,000